+94 11 291 1224 | info@kelanicables.com

CSR



  • Kelani Saviya

    Fri, 30, July 2021

    Most of the self-employed electricians are totally unaware of the theoretical background of the domestic and industrial wiring installation and also the application process. They pick up the knowledge by looking at someone who is an experienced electrician or work with him for a considerable period of time as a helper. This was their common learning process to become an electrician.


    We understand that, these self-employed electricians know the science and the art of installation of power and telecommunication cables either domestic or industrial purpose to give electricity supply to buildings, machines, equipment’s etc., or any other electrical applications, up to some extent to satisfy their clients. However, the bitter truth behind the story is none of these electricians have the idea as to why it happens or how power is transmitted from one end to the other end or the mechanism of the power installation process. As a practice they simply do their profession from one generation to the other.


    In a Brainstorming secession our management team has unanimously decided to have a strong collaborative link with the Electrical and Electronic Engineering Department of the Faculty Of Engineering , University of Peradeniya in 2007. Accordingly we signed a MOU with them and launched Unique Kelani Saviya CSR program in 19 th of January 2007 at the University of Peradeniya.


    The entire course was designed by Professor in Electrical and Electronic Engineering, Prof. Janaka Ekanayake. The course consists of Nine Modules including theory and practical secessions. An examination will be conducted after the three modules. The students who successfully complete their level 1 exam are eligible to follow the Level 2. Those who qualify to follow the level 2 and level 3
    exams will be awarded with an internationally recognized certificate from the University of Peradeniya. Since 2007, up to date the Kelani Saviya CSR is continuing with its 11 th Batch.


    Previous Next